A written work order
Every job starts with a work order: what is included, what is not, the price, and the dates. It is the agreement. Nobody starts before it is signed.
No work order, no start.
Valiant & BoldContractors · Kelowna778-594-1972Get a quote
The Valiant & Bold standard
Six rules that run every job, taken straight from the agreements every Valiant & Bold trade signs.

Why it is written down
A promise you cannot point to is a hope. So we put every promise on paper, in the work order you sign and in the agreement every trade on your site signs.
Six rules
Every job starts with a work order: what is included, what is not, the price, and the dates. It is the agreement. Nobody starts before it is signed.
No work order, no start.
An extra is a signed change order with a price, not a conversation on the driveway. If safety forces an immediate change, it is confirmed in writing the same day or the next business day.
Nothing is added to a bill in conversation.
Every subcontractor works under a written agreement and gives us a WorkSafeBC clearance letter before starting and again before final payment, and carries the insurance the agreement requires.
No clearance letter, no site access.
Deliveries are counted against a material register at the start. Shortages and damage are written down. More material is only bought on a written approval from Eduardo.
You pay for what the job used.
No alcohol, cannabis or other intoxicants on the site, on paid time or behind the wheel. Anyone can refuse unsafe work and say why. Hazards and near misses are reported.
Zero impairment. No exceptions.
At the end you get a written deficiency list with a deadline for every item. Where the Builders Lien Act applies, the 10% holdback is handled by the rules. The final account is settled within 15 business days.
Finished means finished on paper.

The work order
The work order is the agreement for your job. It is written after we walk the site with you, and nobody starts until it is signed. When something changes, a change order is written, priced and signed before the extra work is done.
A job, start to finish

Call 778-594-1972 or send the form. Tell us where the job is, what has to be done, and when.
We look at the site with you, ask what the space has to do, and note what needs a permit.
Scope, exclusions, price and dates on paper. Read it, ask, change it. Sign when it is right.
Trades named and cleared, materials counted, changes signed. You know who is on your property.
A dated deficiency list, inspections passed, and a final account within 15 business days.

On the site

Closeout
Get a written quote
Where it is, what needs doing, and when. You get a reply from Eduardo, then a walk of the job, then a work order on paper.
Call or text778-594-1972